Custom dashboards are in beta and need the Professional plan or higher. On a lower plan, the Custom tab shows an upgrade notice.
Create a dashboard
- Open Dashboard.
- Click + after the tabs (it says Custom when you have no custom dashboards yet).
- Enter a name, for example “Weekly review”, and click Create.
Date range and comparison
Charts on a custom dashboard follow the date range in the Dashboard header. So leave the period out of a chart’s title. When you turn on Compare to previous period in the date picker, every chart compares with the previous period. The All / Paid and channel filters of the other tabs do not apply here. Each chart has its own filters instead.Add a chart
Click Add chart. A dashboard can hold up to 24 charts. The chart editor has these fields:Title
Optional. If you leave it empty, Octanist makes a title from the metric and breakdown.Data
What the chart is about:Metric and Second metric
Pick the main Metric. Optionally pick a Second metric to show next to it. Metrics per data source:- Leads & ad spend: Total Leads, Open Leads, Qualified Leads, Won Leads, Lost Leads, Value Won, Value Lost, Average Lead Value, Ad spend, Extra costs, Total cost, Cost Per Lead, Cost Per Qualified Lead, Cost Per Won Lead, Cost per Click, Qualification Rate, Qualified Win Rate, Won Rate, Click-Through Rate, Clicks, Impressions, Return on Ad Spend, Won to Lost Ratio.
- Website traffic: Sessions, Visitors, Page views, Leads from visits, Qualified from visits, Won from visits, Revenue from visits, Conversion rate, Revenue per session.
- Ad platforms: Ad spend, Clicks, Impressions, Click-through rate, Cost per click, Platform conversions, Cost per platform conversion.
- Calls: Calls, Answered calls, Missed calls, Missed call rate, Average call duration, Calls that became leads, Call to lead rate.
Platform conversions are the conversions your ad platforms report themselves. They are not Octanist leads.
Break down by
How the chart groups its data. No breakdown (totals) shows one number. Over time shows how the metric develops over the date range. Other breakdowns depend on the data source:- Leads & ad spend: Channel, Source (attributed), Medium (attributed), Campaign (UTM), Source / medium, Source / medium / campaign, Ad campaign (with spend), Lead status, Label, Form, Visit country, Device, Browser, Operating system, Website, Landing page, Referrer, UTM source, UTM medium, UTM campaign, Phone country, Lost reason, Custom field, Day of the week, Hour of the day, Day and hour.
- Website traffic: Channel, Referrer, Landing page, Page, UTM source, UTM medium, UTM campaign, Website, Device, Country, Browser.
- Ad platforms: Ad platform, Ad account, Campaign, Ad group.
- Calls: Call status, Channel, UTM source, UTM campaign, Landing page, Day of the week, Hour of the day, Day and hour.
utm_campaign value instead and has no spend.
For Custom field, enter the Custom field key, for example budget.
Split by
Only for Over time. Draws one line per value, for example leads over time with one line per channel. The six biggest values get their own line and the rest are combined as “Other”. Choose One line (total) for a single line. Website traffic charts cannot be split yet. Split charts do not compare periods.Comparison
Pick No comparison, Compare with previous period, Compare with same days last month or Compare with same period last year.Show as
- Number cards
- Line chart
- Bar chart
- Table
- Funnel
- Heatmap (day and hour): for the Day and hour breakdown.
- World map: for country breakdowns.
Only leads where
For Leads & ad spend charts, click Add condition to limit the chart to certain leads. Pick a field (such as Email, Phone, Phone country, Name, Note, Visit country, Device, Browser, Operating system, Website, Landing page, Referrer or a UTM field), a condition (is, is not, contains, is filled in or is empty) and values. Separate several values with commas, for exampleNL, BE.
If a combination is not possible, the editor tells you to check the metric, breakdown and filters.
Arrange charts
Use a chart’s options menu (…) to:- Edit the chart.
- Make full width or Make half width.
- Move earlier or Move later.
- Remove the chart.